Skočiť na hlavný obsah
We are renovating the ROTO ECO website for you. As a result, some features may be disabled.

Determining the size of the purifying plant

 

  • The size of the waste water treatment plant is determined in population units (PU) or equivalent persons, while defining the biochemical capacity of the waste water treatment plant. PU unit means a specific water consumption of 0.15 to 0.20 m3 / per person /a day and a biochemical load of 0.06 kgBPK5 / per person/a day.
  • working volume, which is needed to clean sewage water is 5000 to 800 L per person
     

 

Accomodations:

  • 3-persons = 1 PU

Apartments:

  • 2-persons = 1 PU

Restaurants:

  • with kitchen – 2-persons = 1 PU
  • without kitchen – 3-persons = 1 PU
  • garden terrace – 10-persons = 1 PU (without kitchen)

Data needed for projecting, calculating PU and purchuasing.